| Leisure Complex Listed as a Protected Monument The indoor complex Münster-Mitte shows a charming interaction of old and new. The historic brick building was redeveloped and a transparent extension with the latest leisure facilities was added. With construction costs of only 7.7 m. Eur during the period 1998/99, the complex is a testament to how well the protection of listed buildings and economical considerations let themselves be combined. |
| Key Figures and Facts Start of Construction _ June 1998 (Teilabbruch Altbau) Completion _ November 1999 Construction Costs _ 6,0 Mio. EUR* Project Managerin _ Birte Thönelt *excluding VAT, CG 200-600 Constructed Area _ 2.195 m2 Building Volume _ 28.970 m3 Net Main Usage Areas _ 2.515 m2 Water Areas _ 533 m2 Room Programme |