Overview
Home
Offices of Dr. Krieger
Sports and Leisure Complex Construction
Industrial and Commercial Construction


Schulte-Schlagbaum AG,
Administration Building
Start of Construction _ 1997
Completion _March 1998
Construction Costs _ 2,2 Mio. EUR*
Project Manager _ Michael Krieger

* excl. VAT, CG 200-600


Production Workshop
A Lot of Room for Flexibility


With its new production workshop for the manufacture of modern lock and control systems, the Schulte-Schlagbaum AG has set new standards.
The high-tech optical effect of the large-scale lightweight construction building with its steel suspension construction corresponds entirely to the manufacturing methods of the company.
The new production workshop is connected to the administration building by a railway underpass.

A Workshop without Pillars

The request from the client was that a workshop was constructed for the production of his checkout and control systems that was as free of pillars as possible. The architects came up with an unusual solution: A steel suspension construction, which spans an area of 2500 sq m as a lightweight construction. In this way, a construction was found for which the only structural requirement was a single pillar in the centre and which, over and above that, is also very interesting from an economical point of view.


Contact

Dr. Krieger
Architekten + Ingenieure
GmbH & Co. KG

Blumenstraße 2
42551 Velbert
Germany
T +49 (0)2051-3107-0
F +49 (0)2051-3107-90
info@architekt-krieger.de


© 2009 Dr. Krieger,
Imprint