|
|
|||||||||||||||||||||
![]() |
![]() |
|||||||||||||||||||||
|
||||||||||||||||||||||
|
||||||||||||||||||||||
| Start of Construction _ 1997 Completion _March 1998 Construction Costs _ 2,2 Mio. EUR* Project Manager _ Michael Krieger * excl. VAT, CG 200-600 Production Workshop A Lot of Room for Flexibility With its new production workshop for the manufacture of modern lock and control systems, the Schulte-Schlagbaum AG has set new standards. The high-tech optical effect of the large-scale lightweight construction building with its steel suspension construction corresponds entirely to the manufacturing methods of the company. The new production workshop is connected to the administration building by a railway underpass. A Workshop without Pillars The request from the client was that a workshop was constructed for the production of his checkout and control systems that was as free of pillars as possible. The architects came up with an unusual solution: A steel suspension construction, which spans an area of 2500 sq m as a lightweight construction. In this way, a construction was found for which the only structural requirement was a single pillar in the centre and which, over and above that, is also very interesting from an economical point of view. |
| Contact | ||
Dr. Krieger Architekten + Ingenieure GmbH & Co. KG Blumenstraße 2 42551 Velbert Germany T +49 (0)2051-3107-0 F +49 (0)2051-3107-90 info@architekt-krieger.de © 2009 Dr. Krieger, Imprint |